User Defined 480V-A Grid Standard

Created by Victor Herrera, Modified on Wed, Jun 15, 2022 at 10:05 AM by Victor Herrera

User Defined 480V-A Grid Standard

ParameterValueValue Phase to GroundDescription
OV-G-V1528V304vLevel 1 Phase to Phase over voltage trip set point
OV-G-V1 - T
1s
Duration of grid over voltage trip point
OV-G-V2
576V332vLevel 2 Phase to Phase over voltage trip set point
OV-G-V2 - T
.16s
Duration of grid over voltage trip point
UN-G-V1422.2V243VLevel 1 Phase to Phase under voltage trip set point
UN-G-V1 - T
2s
Duration of grid under voltage trip point
UN-G-V2
288V166VLevel 2 Phase to Phase under voltage trip set point
UN-G-V2 - T
.16s
Duration of grid under voltage trip point
OV-G-F160.5Hz
Level 1 Grid over frequency trip set point
OV-G-F1 - T
2s    
Duration of grid over frequency trip set point
OV-G-F2
62Hz
Level 2 Grid over frequency trip set point
OV-G-F2 - T
.16s
Duration of grid over frequency trip set point
UN-G-F159.5Hz
Level 1 Grid under frequency trip set point
UN-G-F1- T
2s
Duration of grid under frequency trip set point
UN-G-F2
57Hz
Level 2 Grid under frequency trip set point
UN-G-F2 - T
.16s
Duration of grid under frequency trip set point

Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article